Flute and straighten all main rib flanges. Deburred first. Then trimmed flanges as per plans on page 15-03. Moved to match-drill the trimmed main rib using the rib doubler as a guide. Then deburred. Continued on with step #6 & 7 before stopping for the night. Tomorrow I’ll rivet the rib doublers in place, etc. It will be a heavy day of riveting.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2008
(42)
-
▼
August
(20)
- Install Top Left Wing Skins August 29, 2008
- Leading Edge Skins (Left Wing) August 28, 2008
- Riveting the L Leading Edge
- Left Wing Bottom Skin Install, August 24, 2008
- Wiring & Installing Terminal Brackets, Begin Skins...
- Remove Plastic from Skin before Adjusting Stall Sw...
- Stall Warning Switch Installation, August 20, 2008
- Left Wing with Right Ribs, August 11, 2008
- Tillamook Fair, then on to Flute and Staighten Mai...
- Adding Nut Plates to Nose Ribs August 1, 2008
- Fluting and Trimming Nose Rib Flanges
- SLANERV12 JULY 30, 2008
- SLANERV12 JULY 27, 2008
- SLANERV12 JULY 26, 2008
- SLANERV12 JULY 25, 2008
- SLANERV12 JULY 24, 2008
- SLANERV12 JULY 22, 2008
- SLANERV12 JULY 21, 2008
- SLANERV12 JULY 20, 2008
- SLANERV12 JULY 18, 2008
-
▼
August
(20)
No comments:
Post a Comment