Sunday, August 17, 2008
SLANERV12 JULY 24, 2008
Put together air-hoses. Took rivet tool apart to put oil in, but found that it was full. Also took metal ‘teeth’ off vice and put wood in place so as to be able to grip without damage. Riveted angle flanges to left spar. The bottom photo shows the placement of clecos and the top shows rivets in place. Ran out of air before running out of riveting and running the compressor now will disturb my condo friends. I will go after it again tomorrow.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2008
(42)
-
▼
August
(20)
- Install Top Left Wing Skins August 29, 2008
- Leading Edge Skins (Left Wing) August 28, 2008
- Riveting the L Leading Edge
- Left Wing Bottom Skin Install, August 24, 2008
- Wiring & Installing Terminal Brackets, Begin Skins...
- Remove Plastic from Skin before Adjusting Stall Sw...
- Stall Warning Switch Installation, August 20, 2008
- Left Wing with Right Ribs, August 11, 2008
- Tillamook Fair, then on to Flute and Staighten Mai...
- Adding Nut Plates to Nose Ribs August 1, 2008
- Fluting and Trimming Nose Rib Flanges
- SLANERV12 JULY 30, 2008
- SLANERV12 JULY 27, 2008
- SLANERV12 JULY 26, 2008
- SLANERV12 JULY 25, 2008
- SLANERV12 JULY 24, 2008
- SLANERV12 JULY 22, 2008
- SLANERV12 JULY 21, 2008
- SLANERV12 JULY 20, 2008
- SLANERV12 JULY 18, 2008
-
▼
August
(20)
No comments:
Post a Comment