Adding Nut Plates to Nose Ribs August 1, 2008
Completed steps 5-10. Had to spend time figuring out which dimple die to use. Called Vans and the guy there said to use the #8, but that seemed to be way to big. So, studied plans more, took out the rivet and sized it to the die that seemed to fit the best and then proceeded to dimple. (I think it was the 3/32). Then completed all dimpling and put the nut plates in place as per plans. Next I’ll move on to page 15-03 and begin by flutting the main Rib flanges. Now I’m off to Cape Lookout so that I get there before Ackley. (He is excited about the prospect of going to Hong Kong as a research assistant. It would be good experience for him and open doors down the road.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2008
(42)
-
▼
August
(20)
- Install Top Left Wing Skins August 29, 2008
- Leading Edge Skins (Left Wing) August 28, 2008
- Riveting the L Leading Edge
- Left Wing Bottom Skin Install, August 24, 2008
- Wiring & Installing Terminal Brackets, Begin Skins...
- Remove Plastic from Skin before Adjusting Stall Sw...
- Stall Warning Switch Installation, August 20, 2008
- Left Wing with Right Ribs, August 11, 2008
- Tillamook Fair, then on to Flute and Staighten Mai...
- Adding Nut Plates to Nose Ribs August 1, 2008
- Fluting and Trimming Nose Rib Flanges
- SLANERV12 JULY 30, 2008
- SLANERV12 JULY 27, 2008
- SLANERV12 JULY 26, 2008
- SLANERV12 JULY 25, 2008
- SLANERV12 JULY 24, 2008
- SLANERV12 JULY 22, 2008
- SLANERV12 JULY 21, 2008
- SLANERV12 JULY 20, 2008
- SLANERV12 JULY 18, 2008
-
▼
August
(20)
No comments:
Post a Comment