Tuesday, April 21, 2009
April 4, 2009: P. 23-07 Vent Brackets
P. 23-07 initiated. Prepared the vent brackets by separating the parts and deburring.
Following the instructions I clecoed the parts together for the vent bracket to final-drill #40 holes in common. Then step #3 calls for MCS the holes in the vent doors. I established correct depth on scrap material and then drilled the vent doors. Step #4 is to file the slot smooth in the F-1087A & B so that the door can be opened and closed smoothly. This went well. Yet to be determined if the door will be smoothly opened after installation.
This is where step #5 has you final drill #30 holes in common on the door parts. After doing the left door as described in the directions, using a block of wood to hold the tabs of the F-1086A & B in place (which worked with effort), I decided to final drill #30 the right side at the bench. The F-1086A & B are very thin (fragile) and when drilling on the bench, the drill bit caught the edge of the part and tore the aluminum in 2 in a blink of the eye. #$%%##$!!! I'll call Vans tomorrow and order a new part!
The new part came on 4/9/09 and spent an hour completing p. 23-07.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
April
(16)
- April 25, 2009: P. 06-07 VS continued
- April 22, 2009: P. 06-06 VS Dimpling
- April 20, 2009: P. 06-06. V-Stab Skeleton
- April 18, 2009: Vertical Stab continued
- April 16, 2009: P 06-04 Vertical Stab Rear Spar
- April 14, 2009: Vertical Stab Upper & Lower Spar Caps
- April 12, 2009: P. 06-02 Vertical Stab
- April 5, 2009: Roll Bar Assembly
- April 4, 2009: P. 23-08 Lower Cowl Hinges
- April 4, 2009: P. 23-07 Vent Brackets
- March 20, 2009: Fuselage skins continued
- March 17, 2009: P. 23-06 Fuselage Side Skins Conti...
- March 15, 2009: P. 23-03, 04 & 05 Fuselage Skins
- March 14, 2009: Safety Wire & Return Fuel Line
- March 8, 2009: P. 28-04: Fuel Line continued
- RV-12: This is what I mean, this is where I'm goin...
-
▼
April
(16)
No comments:
Post a Comment