April 12, 2009: P. 06-02 Vertical Stab
P. 06-02 VS hinge bracket preparation and assembly. Took care to separate and deburr VS-1210 brackets and spacers (VS-1211A&B). Having read tips in the forum, after match drilling and deburring, squeezed rivets in several passes. First setting the rivet with light pressure, just enough to set it in place and moved to next until all were stable in place. Checked that the bearing could still move freely at each squeezed. After about 5 passes, rivets were done and bearing still free.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
April
(16)
- April 25, 2009: P. 06-07 VS continued
- April 22, 2009: P. 06-06 VS Dimpling
- April 20, 2009: P. 06-06. V-Stab Skeleton
- April 18, 2009: Vertical Stab continued
- April 16, 2009: P 06-04 Vertical Stab Rear Spar
- April 14, 2009: Vertical Stab Upper & Lower Spar Caps
- April 12, 2009: P. 06-02 Vertical Stab
- April 5, 2009: Roll Bar Assembly
- April 4, 2009: P. 23-08 Lower Cowl Hinges
- April 4, 2009: P. 23-07 Vent Brackets
- March 20, 2009: Fuselage skins continued
- March 17, 2009: P. 23-06 Fuselage Side Skins Conti...
- March 15, 2009: P. 23-03, 04 & 05 Fuselage Skins
- March 14, 2009: Safety Wire & Return Fuel Line
- March 8, 2009: P. 28-04: Fuel Line continued
- RV-12: This is what I mean, this is where I'm goin...
-
▼
April
(16)
No comments:
Post a Comment