Saturday, April 25, 2009
April 20, 2009: P. 06-06. V-Stab Skeleton
P. 06-06 step 1-4 complete. No surprises here. Used nibbler to removed hatched areas and followed with a file to make smooth. Went to scotchbright wheel to complete edging. I did some of the #19 final-drilling on the drill press, but due to tight corners did the remaining with portable electric.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
April
(16)
- April 25, 2009: P. 06-07 VS continued
- April 22, 2009: P. 06-06 VS Dimpling
- April 20, 2009: P. 06-06. V-Stab Skeleton
- April 18, 2009: Vertical Stab continued
- April 16, 2009: P 06-04 Vertical Stab Rear Spar
- April 14, 2009: Vertical Stab Upper & Lower Spar Caps
- April 12, 2009: P. 06-02 Vertical Stab
- April 5, 2009: Roll Bar Assembly
- April 4, 2009: P. 23-08 Lower Cowl Hinges
- April 4, 2009: P. 23-07 Vent Brackets
- March 20, 2009: Fuselage skins continued
- March 17, 2009: P. 23-06 Fuselage Side Skins Conti...
- March 15, 2009: P. 23-03, 04 & 05 Fuselage Skins
- March 14, 2009: Safety Wire & Return Fuel Line
- March 8, 2009: P. 28-04: Fuel Line continued
- RV-12: This is what I mean, this is where I'm goin...
-
▼
April
(16)
No comments:
Post a Comment