Saturday, October 31, 2009
September 7, 2009: P. 29-03, Fwd Upper Fuselage
P. 29-03. Started the session with "smear"ing fuel tank sealant on the upper surface of the the bottom flange of the F-1201A Firewall Upper. Used a kitchen scale to mix the ratio. Everyone needs one of these scales. Put your container on the scale, reset to zero, add ingredient #1 and then #2 and mix away!
Primed mid cowl hinges nd then match drilled to the firewall spacers and side skins.
Separated and deburred instrument stack angles, stack support pieces and canopy attach doubles (F-1202M-L).
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
October
(11)
- October 31, 2009: P. 27-05 Brake line installation
- October 13, 2009: Fuel Tank started!
- October 8, 2009: EAA Chapter 105 Visit
- September 12. 2009: P. 29-04 Upper Fuselage cont.
- September 7, 2009: P. 29-03, Fwd Upper Fuselage
- August 30, 2009: P. 27-02 Rudder Pedals
- August 13, 2009: P. 29-02 Upper Firewall Assembly
- July 18, 2009: P. 24-05 Baggage Bulkhead cont.
- July 15, 2009: P. 24-04, Baggage Bulkheads
- July 14, 2009: P. 24-03 roll bar continued
- July 12, 2009: P. 24-02 Roll bar frames
-
▼
October
(11)
No comments:
Post a Comment