Wednesday, October 21, 2009

July 18, 2009: P. 24-05 Baggage Bulkhead cont.

P. 24-05 steps 1-5. After dimpling and installing all nutplates (step 1) I primed the baggage bulkhead with 7220 self-etching primer. Step 2 has you flute the bulkhead to have the holes line up with the holes on the side skin (F-1270). I clecoed the bulkhead into place and did not see the need to flute to align the holes. I then riveted the bulkhead into place as per plans to rivet only to the baggage floor and baggage bulkhead. when I got to the point of installing the SB375-4 bushing, I discovered I was one bushing short of a full load. Will call Van's on Monday.

No comments: