July 18, 2009: P. 24-05 Baggage Bulkhead cont.
P. 24-05 steps 1-5. After dimpling and installing all nutplates (step 1) I primed the baggage bulkhead with 7220 self-etching primer. Step 2 has you flute the bulkhead to have the holes line up with the holes on the side skin (F-1270). I clecoed the bulkhead into place and did not see the need to flute to align the holes. I then riveted the bulkhead into place as per plans to rivet only to the baggage floor and baggage bulkhead. when I got to the point of installing the SB375-4 bushing, I discovered I was one bushing short of a full load. Will call Van's on Monday.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
October
(11)
- October 31, 2009: P. 27-05 Brake line installation
- October 13, 2009: Fuel Tank started!
- October 8, 2009: EAA Chapter 105 Visit
- September 12. 2009: P. 29-04 Upper Fuselage cont.
- September 7, 2009: P. 29-03, Fwd Upper Fuselage
- August 30, 2009: P. 27-02 Rudder Pedals
- August 13, 2009: P. 29-02 Upper Firewall Assembly
- July 18, 2009: P. 24-05 Baggage Bulkhead cont.
- July 15, 2009: P. 24-04, Baggage Bulkheads
- July 14, 2009: P. 24-03 roll bar continued
- July 12, 2009: P. 24-02 Roll bar frames
-
▼
October
(11)
No comments:
Post a Comment