Saturday, October 31, 2009
August 30, 2009: P. 27-02 Rudder Pedals
P. 27-02. Plans are well written and if followed, this page went together quite well. I found that in step 3, it helped to do some filing on the WD-1206 Rudder Pedals on the end of the tubes. This facilitated sliding the WD-1211 Brake Pedal Torque Tubes on.
Then moved on to P. 27-03. Again, follow the directions and it goes together as advertised. I clamped the rudder pedals onto the workbench and took my time to line things up before drilling. I think the most challenging part of this page was getting the cotter pins in correctly and bent right.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
October
(11)
- October 31, 2009: P. 27-05 Brake line installation
- October 13, 2009: Fuel Tank started!
- October 8, 2009: EAA Chapter 105 Visit
- September 12. 2009: P. 29-04 Upper Fuselage cont.
- September 7, 2009: P. 29-03, Fwd Upper Fuselage
- August 30, 2009: P. 27-02 Rudder Pedals
- August 13, 2009: P. 29-02 Upper Firewall Assembly
- July 18, 2009: P. 24-05 Baggage Bulkhead cont.
- July 15, 2009: P. 24-04, Baggage Bulkheads
- July 14, 2009: P. 24-03 roll bar continued
- July 12, 2009: P. 24-02 Roll bar frames
-
▼
October
(11)
No comments:
Post a Comment