Monday, July 20, 2009
June 29, 2009: Static Air System continued
P. 10-08, step 8 and p. 10-09, steps 2-9. Things progress pretty well. Not sure about seal around static air joints, but did what plans indicated. Needed to put end of clear tubing in teapot of boiling water to soften and then slide over the joint. Moving onto p. 10-09, no problems and most of the page consists of riveting tailcone skins to frames. Routed strings for rudder control cable to be installed later.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2009
(89)
-
▼
July
(15)
- RV 12 Seats
- July 10, 2009: Static Air continued
- June 29, 2009: Static Air System continued
- July 4-9 Vacation in Boston!
- June 26, 2009: Static Air System
- June 20, 2009: Tailcone Continued & Seatbacks comp...
- June 13, 2009: Pitch/Trim Wire Install
- June 6, 2009: Attach Tail Cone Skins
- June 3, 2009: Trial fit HS
- May 31st, 2009: Aft bulkhead in Tailcone (F-1211)
- May 30, 2009: Tailcone
- May 29, 2009: Tailcone continued
- My Dad's Birthday!
- Scott's Birthday
- Coffee at Starbucks!
-
▼
July
(15)
No comments:
Post a Comment