Fabricated the F-1201L bracket (3 times!) on Page 22-03. The 1st two were less than acceptable because I had difficulty match drilling the holes through the firewall and keeping the bracket snug against the tunnel rib. Must keep in mind that not only is the task to build a plane, but to learn a great deal about it along the way.